Project:BB|1065

Title
Adjustment of the guidelines for an integrated sewage system: storm water drainage (construction and management of ditches) and provisions by sewer overflows: ecological construction.
Acronym
 
URL
StartDate
2002-01-01
EndDate
2003-04-30
Amount
 

Abstract

The guidelines of 1996 have to be adjusted to current technologies. Part of this actualization was to develop guidelines for an ecological construction of several parts of the sewage system. Especially infiltration supplies, ditches and provisions of combined sewer overflows can become part of the ecological infrastructure with some adjustments. Guidelines for such an ecological construction were made based on literature, foreign methods and advices from experts. Special attention was given to storm water runoff quality. One section of the guidelines deals with the best practices to prevent or to treat pollution of storm water runoff.

Keywords

infiltration, ecological construction, combined sewer overflows, storm water runoff, sewage system, ditches

Classifications

Inland Waters {Habitat type}

People

Name Role Start End
Meire, Patrick promotor

Orgunits

Name Role Start End
Ecosystem Management Research Group unknown

created:2011-12-14 14:18:59 UTC, source:iweto

© 2012 by the Belgian Biodiversity Platform