The project objectives can be summarized as follows : (i) cali- bration and validation of the MIKE-SHE model using the data of 4 sub-basins of the river Meuse (the basin of the Geer, Hoyoux, Omeaux and Ourthe), (ii) assessment of the accuracy and relia- bility of the model output given the disturbance in time and space on model input and model parameters, and (iii) use of the calibrated MIKE-SHE model to predict the impact of global climate change on the hydrology of the 4 subbasins used in the calibra- tion/validation phase of the project.
distributed hydrologic modelling, model calibration, model validation, physical-based modelling, reliability assessment, sensitivity analysis
Belgium {Geographical scope}
| Name | Role | Start | End | 
|---|---|---|---|
| Feyen, Jan | promotor | 
| Name | Role | Start | End | 
|---|---|---|---|
| Division Soil and Water Management | unknown | 
created:2011-12-14 14:18:59 UTC, source:iweto